  • A wind turbine blade mold over 200 wheels

    • Renewable energy
    Find out how we transported a huge new mold, for manufacturing over-60-meter-long wind turbine blades, between Bilbao port and the ACCIONA Blades plant in Navarre
    • facebook
    • twitter
    • linkedin
    • mail
    • whatsapp
  • The ACCIONA Blades plant at Lumbier, Navarre, received on 4 July the new mold it needs to manufacture the longest blades designed to date by the company. The 61.2 meter blades are to be mounted onto the rotors of its 3-MW AW 125/3000 wind turbine generators.

    Behind it lay a nautical voyage of 18,000 kilometers. Loaded onto a ship in Shanghai, the mold made it by sea to the port of Bilbao in northern Spain. Then it was hauled over a complex threenight journey by road to Lumbier in the region of Navarre, home of the ACCIONA Blades plant. All in all, the operation represented a unique logistical challenge for the company.

    A special road vehicle was used to transport the mold over the final 225 km from Bilbao to Lumbier, a MAN 600-horsepower cab unit drawing the load on a 200-wheel flat bed trailer.

    Given that this type of freight is only authorized to move at night, the trip was allotted strict time slots and had to perform some especially complicated maneuvers. Such as at the junction of the N622 with A1 in Vitoria, where 200 meters of crash barrier and 20 road signs had to be dismantled —and reassembled immediately afterwards— for the truck and trailer to get round a 270-degree horseshoe bend.

    • All was meticulously planned, though, in a job that took months to organize, involving the processing of numerous permits from the different local governments en route.

      As well as the driver and four engineers accompanying the load, two support vehicles also made the trip, and two others containing Basque and Navarre police, as well as one from the corresponding motorway concession Company. A spectacular convoy, then, that left no one indifferent. A few motorists out and about during the post-midnight hours had the opportunity to contemplate the enormous load on its way.

    • The truck needed three nights to make the 225 km trip from Bilbao port to the ACCIONA blades plant at Lumbier (Navarre)

  • ACCIONA’s Lumbier plant has obtained orders to manufacture 84 sets of blades (252 units) for AW3000 wind turbine generators in 2014, of which 19 sets (57 units) correspond to the giant AW 125/3000 model. The ACCIONA Blades workforce in Lumbier is set to climb to over 300 by the end of July so the company can cope with rising demand.

  • DISCOVER THE CORRECT ANSWER

    How many tons does the blade wind turbine mold weigh?

    UPS! THAT IS NOT THE CORRECT ANSWER. TRY ANOTHER OPTION
    • 50 tons UPS! THAT IS NOT THE CORRECT ANSWER. TRY ANOTHER OPTION
    • 64,3 tons
    • 72,9 tons UPS! THAT IS NOT THE CORRECT ANSWER. TRY ANOTHER OPTION

    64,3 tons

    Toneladas pesa el molde de palas de aerogenerador

    Hizo falta un camión de 68,5 m de largo, 4,6 m de ancho y 4,8 m de alto y 200 ruedas de remolque para poder transportarlo.

  • A very special load

    • Departure point: Port of Bilbao
    • Destination: ACCIONA Blades (Lumbier, Navarre)
    • Truck dimensions: 68.5 m long, 4.6 m wide and 4.8 m high
    • Truck weight: 120 metric tons
    • Mold weight: 64.3 metric tons
    • Mold length: 62 meters
    • No of wheels: 200
    • Power cab: 600 CV MAN
    • Speed: 10-40 km/h

    Team:

    • 1 driver, 4 engineers
    • 2 truck company support vehicles
    • 1 motorway concession company support vehicle
    • 1 vehicle each from Basque/Navarre police

     

    Discover more stories like this in Experience by ACCIONA.

     

     

  • YOUR OPINION ALWAYS MATTERS

    Do you think that more money should be invested in renewable energies?

    Thanks for your answer ( votaciones)
    • 0 Yes
    • 0 No
  • Have you enjoyed the article? Share it!

    • facebook
    • twitter
    • linkedin
    • mail
    • whatsapp
    • Sishen: where the sun's the limit

      • Renewable energy
    • The challenge of storing renewable energy

      • Renewable energy
    • ACCIONA is a leader in providing sustainable solutions for infrastructure and renewable energy projects across the world.

        • Renewable energy
        • Transport
        • Water
        • Social
        • Cities
        • Sustainability
        • Innovation
      • ACCIONA Experience
        • Legal Note
        • Cookies Policy
        • Privacy Policy
        • Contact
        • Ethical Channel
        © Copyright ACCIONA Experience 2025
    • Do you like our stories? Subscribe!

      You must provide a contact email

      YOU’RE JUST ONE STEP AWAY!
      Please, confirm your subscription on the email we have sent you and your registration will be completed.

      An error has ocurred while attempting to register your e-mail. Try to register again later.

      YOU ARE NOW SUBSCRIBED TO THE NEWSLETTER! If you've missed our content, try checking your spam folder and add us to your address book so you can enjoy it without any problems.

Information on data protection

In compliance with Regulation (EU) 2016/679 on Data Protection and with other Data Protection regulations in force, you are hereby informed that your personal data shall be processed by Acciona, S.A. (hereinafter “ACCIONA”), whose identification data are as follows: Tax ID No. (NIF): A08001851; Address: Avenida de la Gran Vía de Hortaleza, 3, 28033 (Madrid); Tel. No.: +34 91 663 28 50; email: protecciondedatos@acciona.com. Your data shall be processed in order to send you information, through the subscription to our Newsletter through electronic means, regarding our latest technological innovation of ACCIONA´s initiative "EXPERIENCE".

The consent given by the data subject by indicating that they have read and accept this data protection information comprises the lawfulness of processing. The data provide is your email address. If you fails to provide the required data, the subscription Request cannot be satisfied. We may also process your satisfaction or preferences, if you voluntarily respond to surveys. Data shall be stored until the elimination is requested.

In order to carry out our purpose, we may give access to your data to service providers (such as technology service providers) who assist us in fulfilling this purpose. Some of its service providers, may be located outside of the European Economic Area in territories that do not offer a level of data protection that is comparable to that of the European Union. In such cases, we transfer User data with appropriate safeguards and always ensuring the security of the same.

The data subject can exercise their rights of access to or rectification, erasure or portability of their data, and/or the restriction of or objection to the processing of such data, by contacting Acciona, S.A. by writing the Department of Data Protection located at Avenida de la Gran Vía de Hortaleza, 3, 28033 (Madrid) or by sending the form available in the link:

FORM

If we consider it necessary in order to be able to identify you, we may ask you for a copy of an identity document. Furthermore, at any time the data subject may withdraw the granted consent by contacting the aforementioned address and file a claim to the Supervisory Authority (Agencia Española de Protección de Datos www.aepd.es). You can also unsubscribe from the Newsletter communication.

For any further information you can visit the Privacy Police on the website https://experience.acciona.com/privacy-policy/.